REQUEST FOR PROPOSAL (RFP) – DRILLING AND EQUIPPING OF A BOREHOLE (NAIKARA COMMUNITY, NAROK)

RFP Reference: AWF/NRK/BH/01/2025
Date Issued: December 10, 2025
Closing Date: December 24, 2025

1. Introduction

African Wildlife Foundation (AWF) invites proposals from licensed and experienced borehole drilling contractors for the drilling, construction, development, and test pumping of a community water borehole at Naikara, Narok County.
This assignment will be delivered in accordance with the attached Hydrogeological and Geophysical Survey Report (October 2025).

2. Scope of Works

The contractor is expected to carry out:

2.1 Mobilization

  • Mobilize drill rig, compressor, personnel, materials, and support equipment.

2.2 Drilling

  • Drill an 8-inch diameter borehole to a depth of 220–250m at the recommended site (Station No.2, Profile 1).
  • Maintain full drilling logs and geological sample collection at 2m intervals.
  • Record water strike levels, drilling penetration rate, and rest water levels.

2.3 Casing and Well Construction

  • Install 6-inch mild steel casing and screen.
  • Provide gravel pack (2–4 mm).
  • Install centralizers every 6m.
  • Grout top 5m with cement-bentonite mix.

2.4 Development

  • Develop the well through airlifting, surging, and flushing until clear water is obtained.

2.5 Pump Testing

  • Conduct 24-hour constant discharge test.
  • Conduct 2-hour recovery test.
  • Provide complete pumping test analysis.

2.6 Water Quality Analysis

  • Collect samples for: chemical, physical, and bacteriological analysis (from accredited laboratory).

3. Deliverables

  1. Driller’s log
  2. Geological formation log
  3. Borehole construction/completion details
  4. Pumping test data and analysis
  5. Water quality test results
  6. Borehole completion report

4. Mandatory Requirements

Bidders must provide:

  • Valid WRA Driller’s License
  • Valid NCA 6 and above Certification for Water Works
  • Certificate of Incorporation
  • KRA PIN & Tax Compliance Certificate
  • Evidence of similar assignments (minimum 3)
  • Workplan and methodology
  • List of equipment and ownership
  • CVs of key technical personnel
  • Health, Safety & Environment (HSE) plan

5. Proposal Structure

Technical Proposal

  • Company profile
  • Methodology & workplan
  • Rig capacity and drilling technology
  • Past experience
  • Organizational structure & key personnel

Financial Proposal

  • All-inclusive BoQ showing:
    • Mobilization/demobilization
    • Drilling per meter (soft, hard, rock)
    • Casing, screens
    • Gravel pack
    • Well development
    • Test pumping
    • Water quality testing
  • All taxes included
  • Prices in Kenya Shillings (KES)

6. Evaluation Criteria

Criteria

Weight (%)

Compliance with mandatory requirements

Pass/Fail

Technical capacity & methodology

40%

Experience & equipment

30%

Financial proposal

30%

7. Submission Guidelines

Submit proposals clearly marked:
“RFP – NAIKARA BOREHOLE DRILLING”

To: [email protected] 

Deadline: December 24, 2025

8. AWF Disclaimer

AWF may accept or reject any bid and is not bound to award the lowest bidder.
 

BILL OF QUANTITIES (BoQ) – DRILLING & SOLARIZATION

A. DRILLING WORKS

Item

Description

Unit

Qty

Rate (KES)

Amount (KES)

1

Mobilization & Demobilization

LS

1

  

2

Drilling – Soft Formation (0–50m)

m

50

  

3

Drilling – Medium Formation (50–150m)

m

100

  

4

Drilling – Hard Rock (150–250m)

m

100

  

5

Steel Casing – 6”

m

40

  

6

Screen – 6”

m

20

  

7

Gravel Pack (2–4 mm)

6

  

8

Cement Grouting

m

5

  

9

Well Development (Airlifting)

hr

5

  

10

Test Pumping – 24 hrs + Recovery

LS

1

  

11

Water Quality Testing

LS

1

  

12

Borehole Completion Report to include acquisition of abstraction from WRA

LS

1

  

Subtotal A: Drilling Works

B. SOLARIZATION WORKS

Item

Description

Unit

Qty

Rate

Amount

1

Submersible 5 Cubic Solar Pump

No.

1

  

2

Solar PV Panels (Total Wattage)

W

[Based on pump size]

  

3

Panel Mounting Structure

LS

1

  

4

Sunverter

No.

1

  

5

Rising Main (PN16 HDPE)

m

[Insert]

  

6

Delivery Pipeline to Tank

m

[Insert]

  

7

Elevated 10,000L plastic 

No.

1

  

8

Steel Stand for the 10,000L tank

Ls

 

 

 

9

Plumbing & Fittings

LS

1

  

10

Testing & Commissioning

LS

1

  

Subtotal B: Solarization Works

C. SUMMARY

Description

Amount (KES)

Subtotal A – Drilling

 

Subtotal B – Solarization

 

Grand Total (KES)