1. Introduction
African Wildlife Foundation (AWF) invites proposals from licensed and experienced borehole drilling contractors for the drilling, construction, development, and test pumping of a community water borehole at Naikara, Narok County.
This assignment will be delivered in accordance with the attached Hydrogeological and Geophysical Survey Report (October 2025).
2. Scope of Works
The contractor is expected to carry out:
2.1 Mobilization
- Mobilize drill rig, compressor, personnel, materials, and support equipment.
2.2 Drilling
- Drill an 8-inch diameter borehole to a depth of 220–250m at the recommended site (Station No.2, Profile 1).
- Maintain full drilling logs and geological sample collection at 2m intervals.
- Record water strike levels, drilling penetration rate, and rest water levels.
2.3 Casing and Well Construction
- Install 6-inch mild steel casing and screen.
- Provide gravel pack (2–4 mm).
- Install centralizers every 6m.
- Grout top 5m with cement-bentonite mix.
2.4 Development
- Develop the well through airlifting, surging, and flushing until clear water is obtained.
2.5 Pump Testing
- Conduct 24-hour constant discharge test.
- Conduct 2-hour recovery test.
- Provide complete pumping test analysis.
2.6 Water Quality Analysis
- Collect samples for: chemical, physical, and bacteriological analysis (from accredited laboratory).
3. Deliverables
- Driller’s log
- Geological formation log
- Borehole construction/completion details
- Pumping test data and analysis
- Water quality test results
- Borehole completion report
4. Mandatory Requirements
Bidders must provide:
- Valid WRA Driller’s License
- Valid NCA 6 and above Certification for Water Works
- Certificate of Incorporation
- KRA PIN & Tax Compliance Certificate
- Evidence of similar assignments (minimum 3)
- Workplan and methodology
- List of equipment and ownership
- CVs of key technical personnel
- Health, Safety & Environment (HSE) plan
5. Proposal Structure
Technical Proposal
- Company profile
- Methodology & workplan
- Rig capacity and drilling technology
- Past experience
- Organizational structure & key personnel
Financial Proposal
- All-inclusive BoQ showing:
- Mobilization/demobilization
- Drilling per meter (soft, hard, rock)
- Casing, screens
- Gravel pack
- Well development
- Test pumping
- Water quality testing
- All taxes included
- Prices in Kenya Shillings (KES)
6. Evaluation Criteria
Criteria | Weight (%) |
|---|---|
Compliance with mandatory requirements | Pass/Fail |
Technical capacity & methodology | 40% |
Experience & equipment | 30% |
Financial proposal | 30% |
7. Submission Guidelines
Submit proposals clearly marked:
“RFP – NAIKARA BOREHOLE DRILLING”
Deadline: December 24, 2025
8. AWF Disclaimer
AWF may accept or reject any bid and is not bound to award the lowest bidder.
BILL OF QUANTITIES (BoQ) – DRILLING & SOLARIZATION
A. DRILLING WORKS
Item | Description | Unit | Qty | Rate (KES) | Amount (KES) |
|---|---|---|---|---|---|
1 | Mobilization & Demobilization | LS | 1 | ||
2 | Drilling – Soft Formation (0–50m) | m | 50 | ||
3 | Drilling – Medium Formation (50–150m) | m | 100 | ||
4 | Drilling – Hard Rock (150–250m) | m | 100 | ||
5 | Steel Casing – 6” | m | 40 | ||
6 | Screen – 6” | m | 20 | ||
7 | Gravel Pack (2–4 mm) | m³ | 6 | ||
8 | Cement Grouting | m | 5 | ||
9 | Well Development (Airlifting) | hr | 5 | ||
10 | Test Pumping – 24 hrs + Recovery | LS | 1 | ||
11 | Water Quality Testing | LS | 1 | ||
12 | Borehole Completion Report to include acquisition of abstraction from WRA | LS | 1 |
Subtotal A: Drilling Works
B. SOLARIZATION WORKS
Item | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
1 | Submersible 5 Cubic Solar Pump | No. | 1 | ||
2 | Solar PV Panels (Total Wattage) | W | [Based on pump size] | ||
3 | Panel Mounting Structure | LS | 1 | ||
4 | Sunverter | No. | 1 | ||
5 | Rising Main (PN16 HDPE) | m | [Insert] | ||
6 | Delivery Pipeline to Tank | m | [Insert] | ||
7 | Elevated 10,000L plastic | No. | 1 | ||
8 | Steel Stand for the 10,000L tank | Ls |
|
|
|
9 | Plumbing & Fittings | LS | 1 | ||
10 | Testing & Commissioning | LS | 1 |
Subtotal B: Solarization Works
C. SUMMARY
Description | Amount (KES) |
|---|---|
Subtotal A – Drilling | |
Subtotal B – Solarization | |
Grand Total (KES) |